Signed in as:
filler@godaddy.com
November 16th 2026
November 16th 2026
November 16th 2026

High-voltage power infrastructure is already in place at GigaWatt.land, with multi-level transmission at 345 kV and 500 kV originating from the neighboring power plant within this designated energy community and Qualified Opportunity Zone (QOZ).

Renewable power production from solar
(1.9 GW under construction) and wind (existing 400MW + 600 MW expansion) is co-located as an integrated energy source, combined with long-duration energy storage and a new grid built-in redundancyloop.network

Existing natural gas pipelines at the property, together with planned 36-inch and 42-inch expansions, support capacities of more than 2.7 Bcf/d—equivalent to approximately 12+ GW of power generation.

Onsite water is supplied by existing wells drawing from a massive 27,000-square-mile aquifer located at the center of the property and is co-located next to a waste water treatment plant.

Onsite fiber-optic infrastructure, together with adjacent dark-fiber lines from multiple operators, provides a multi-tier fiber backbone with redundant loop architecture and low latency.

Onsite geothermal power will serve as an additional redundancy energy resource, leveraging the underlaying power resources located adjacent to the property.

Power needs are above 100 MegaWatt and/or up to 15 GW with LDES & 2N redundancy

Your land needs are at least 200 acres or up to 2,000 acres to build your own data center (BYO)

Your Investments to support the Power House & AI Data Center acceleration
Onsite Power for up to 15.0 Gigawatt from several power sources.
We love to know what your needs to supply you with the right power.
Copyright © 2025 Gigawatt.Land - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.